Accessories

Accessories

Underfloor heating accessories play a vital part in any installation. For example, including substrate insulation can increase the energy efficiency of your underfloor heating system by up to 50%!

Accessories

Underfloor heating accessories play a vital part in any installation. For example, including substrate insulation can increase the energy efficiency of your underfloor heating system by up to 50%!

Uncoated insulation boards

Cost effective thermal insulation board for concrete and screed substrates improves insulation and reduces heat loss into the substrate. Maximum insulation with minimal build up height,
ideal for refurbishment applications.

Un-coated insulation board for concrete substrates
Coated insulation boards for timber substrates

Coated insulation boards

Manufactured using a high-density extruded polystyrene
core with a polymer modified, fibre reinforced cement coating
on both sides. These coated insulation boards add rigidity,
strength and thermal insulation to timber substrates, maximising the efficiency of your electric underfloor heating system.

Adhesive & leveller

Tile adhesive specially designed and guaranteed for use with our electric underfloor heating systems or flexible, fast setting, fibre reinforced, cement based self levelling compound.

Flexible Tile Adhesive
Waterproofing tape

Waterproofing

Everything you need for waterproofing a bathroom from tanking systems to waterproofing tape, we have the extra accessories you need to make an installation seamless.

Acoustics

Thermal insulation boards for concrete sub floors. Save up to 50% on running costs. A 9mm thick acoustic insulation board reducing up to 21dB of impact sound reduction.

Acoustic insulation board
Contactor snubber

Electrical

A range of electrical accessories from sensors, back boxes, contactor snubbers and more. Installing a spare floor temperature sensor at the start of every project always leaves you with a backup should anything go wrong. This saves time, money and a heap of hassle.

Your Items

Get in touch with us

Membrane floor build up
Foil floor build up
Screed floor build up
Mesh floor build up

We close at 5pm on 24th Dec and reopen at 7.30am on 4th Jan 2022.

Orders for next day delivery will need to be placed by 4.30pm on the 23rd Dec.