The Electric Towel Bar Collection

Install with ease

Whether you are installing one electric towel bar or multiples, we have made installation a doddle.

  • Single Mount
  • Double Mount

What's in the box

Everything you need for easy installation is included. 1 x towel bar, 4 x fixing screws (for the mounting system), 1 x fixing spigot, 1 x dress ring, 2 x grub screws, 1 x allen key, 1 x 2m cold tail connection cable and installation instructions.

How to install

We have made installation of multiple electric heated towel bars simple. For the perfect installation, we always recommend using our patented towel bar mounting system. Unique to ThermoSphere, it makes towel bar installation stress-free and provides the finished installation with that jaw dropping ‘wow factor’!

Installing with mounting spigots

Just installing a single electric heated towel bar? No problem. There’s no need to use the mounting system as installation is easy. Just follow the simple steps demonstrated in the single without mount video or download the installation guide.

Installing with mounting system

Installing a multiple electric heated towel bars? We’ve made it super easy with our bespoke mounting system. Our installation video shows how straightforward the demonstrated steps are to complete or download the installation guide.

How to wire

The mounting system makes cable management easy. You can run the cables behind the mounting system and drill a hole at the top to pass them into the cavity and up to your wiring point. If you‘re installing on a solid brick/block wall you will need to chase a channel for the cables.

Wiring schematics can be found within the installation guide.

What's in the box

Everything you need for easy installation is included. 1 x towel bar, 4 x fixing screws (for the mounting system), 1 x fixing spigot, 2 x grub screws, 1 x allen key, 1 x 2m cold tail connection cable and installation instructions.

How to install

We have made installation of multiple electric heated double mount towel bars simple. For the perfect installation, we always recommend using our patented towel bar mounting system. Unique to ThermoSphere, it makes towel bar installation stress-free and provides the finished installation with that jaw dropping ‘wow factor’!
Check out the installation playlist to see for yourself, whichever style of towel bar you choose.

Installing over a finished wall

Just installing a single electric heated towel bar? No problem. There’s no need to use the mounting system as installation is easy. Just follow the simple steps demonstrated in the single mount video or download the installation guide.

Installing with mounting spigots

Installing a multiple electric heated towel bars? We’ve made it super easy with our bespoke mounting system. Our installation video shows how straightforward the demonstrated steps are to complete or download the installation guide.

Installing with a mounting system

Installing a multiple electric heated towel bars? We’ve made it super easy with our bespoke mounting system. Our installation video shows how straightforward the demonstrated steps are to complete or download the installation guide.

Towel bar wiring guide

How to wire a single towel bar or multiple, we have created a visual guide on how our towel bars should be wired. Final electrical connections must be completed by a qualified electrician.

Our 3 top installation tips

Transformer

You will require a transformer because they are 12V.

35mm tiling depth

Max 35mm tiling depth over spigots to make sure there is enough spigot protruding out of the wall to fix to.

Wear gloves

Wear latex gloves when handling the bars to avoid finger prints and scratches.

No such thing as a silly question

The transformers for the electric towel bars work on AC.

You will need a 2.5mm Allen key for the grub screws.

The maximum temperature with no towel is between 45 - 55 degrees. The maximum temperature with a towel is up to 65 degrees.

Your Items

Get in touch with us

Membrane floor build up
Foil floor build up
Screed floor build up
Mesh floor build up